On the builder's behalf
Our engineers travel to the end customer's plant and carry out the mechanical erection, the electrical work, the controls and the start-up.

Who we are
Process-line installation and commissioning, carried out at your customer’s plant by our specialized engineering team. On site since 2015.
Our engineers travel to the end customer's plant and carry out the mechanical erection, the electrical work, the controls and the start-up.
A plant in Papua New Guinea, Jordan or Bangladesh needs someone on site for months, not days. We take that posting, under your name and following your procedures.
From raw materials to final processing, our engineering team delivers precise installation across all industrial machinery and sectors.
What We Do
Erection, alignment, electrical work and start-up, through to a running line.
Planned and breakdown work on lines already in production.
Condition and installation checks, reported in the detail you ask for.
Taking a line down, moving it, and putting it back into production.
For existing partners: the visit that keeps a warranty call from becoming a flight.
How We Work
Why OEMs choose us
Earned one job at a time.
Your technicians can’t always make the trip - distance, cost, duration or travel restrictions rule it out, whatever the willingness. We’re built to deploy to exactly those sites.
We adapt to how you work without lowering how we work - on site, our engineers follow your supervising team’s guidance and adopt your procedures, with safety, reporting and quality at the centre of every job.
Mostly on the job, under your supervisor’s guidance as the work progresses - and where it helps, we can also send engineers to your factory beforehand to learn the equipment before they travel.
What we learn on one visit carries into the next, so your site doesn’t start from zero with someone new each time.
Projects
India · 2026 · Apr–Dec
OngoingA composite stone production line at a facility in India: 10 internal silos, automatic pattern system and press, vertical oven with thermal fluid system, and polishing line, with complete mechanical installation and electrical deployment executed directly by our engineering team. Installed and commissioned across 678 daily reports, utilizing a 9-engineer team (4 mechanical, 5 electrical) peaking at 8 on site, with 6 engineers returning for subsequent deployment postings.
India · 2025–26
A composite stone production line at a manufacturing plant in India: 10 internal silos, press, vertical oven with thermal fluid system, polishing line, robot programming, I/O testing, and system start-up. Delivered over a 6-month period (Oct 2025–Mar 2026) totaling 297 engineer-days (184 mechanical, 113 electrical) across 274 daily reports, supported by a 4-engineer team with 3 separate stints executed by a single engineer.
184 mechanical · 113 electrical
Malaysia · 2024–25
Mechanical and electrical installation of a raw-material storage and dosing system in Malaysia: full mechanical and electrical setup paired with raw-material system integration across Silbox storage, intermediate hoppers, dosing mechanisms, and level sensors. Completed across 129 engineer-days and 3 mobilisations over 5 months, initiated by a mechanical lead and completed by a 4-person electrical crew logging 98 total electrical days.
One mechanical engineer opened the job, then the electrical crew carried it.
Project record
20 engineers — 8 mechanical, 9 electrical, 3 design.
Engineer Days Delivered
Projects
production sites
| Country | Clients | Scope | Year | Eng-days |
|---|---|---|---|---|
| India | Breton · Engineered stone production plant, India | Mechanical & electrical: 10 internal silos, multi-level hopper systems, conveyor belts, mixing unit, moulding machine, automatic pattern system, press, vertical oven with thermal fluid system, cooling towers, polishing line | 2026 | 598 |
| India | Breton · Engineered stone production plant, India | Silos, press, oven, polishing, robot programming | 2025–26 | 297 |
| Malaysia | CEPI · Silo System Installation | Mechanical & electrical installation | 2024–25 | 129 |
| Armenia | Sarp | Installation & commissioning | 2024 | 77 |
| Papua New Guinea | CEPI | Installation & commissioning | 2024 | 60 |
| India | Breton | Installation support | 2026 | 53 |
| Australia | CEPI | Installation & commissioning | 2024–25 | 49 |
| Egypt | CEPI | Installation | 2021 | 9 |
| Bangladesh | CEPI | Dosing & conveying, two visits | 2022, 2023 | Not logged |
| Solomon Islands | CEPI | Installation | 2023 | Not logged |
Clients



“In five years of working with Instelio we have sent them to sites from Bangladesh to the Solomon Islands — the installations where getting a technician on site for months is the hardest part of the job.”

“We appreciated your ability to turn our needs into practical solutions.”

Working with us
We bill per engineer-day, and there is no minimum, whether for a quick site review or a complete line start-up.
Contact
S2-19 Dosti Shoppe Imperia, Manpada, Ghodbunder Road,
Thane 400607, Maharashtra, India